How top companies use AI in project management. Watch the global PPM summit, now on demand! Access the content hub
No-Code & Low-Code

Built for PMO teams who can’t wait on IT

Your team knows exactly what they need. The ticket is filed, and then you wait. Weeks later, the process has already changed, and someone has quietly rebuilt the whole thing in a spreadsheet. This is how shadow IT starts. cplace is AI-powered PPM software that puts your PMO team in control. Your team configures, builds, and adapts its own tools directly in the platform.

Request a demo
No-Code and Low-Code in project management with cplace

No-Code and Low-Code,
purpose-built for enterprise

70%

of typical enterprise software requirements can be addressed using cplace No-Code alone

90%

of all enterprise software needs are covered when No-Code and Low-Code are combined on the cplace platform

40%

productivity gains reported by early adopters of AI in project and portfolio management

Start from proven PPM foundations

cplace comes with ready-to-use solution templates and pre-configured components developed with leading enterprises across manufacturing, automotive, aerospace, and pharma. Your team adapts what already works.

One AI platform for every skill level

Business analysts, power users, and professional developers all work in the same environment. That shared foundation is also what makes AI in cplace genuinely useful. It works on your real project data, not on exports or copies.

Icon Cog Double

Real-time configuration without deployment

Unlike platforms that require deployment cycles or scheduled release windows, cplace applies every No-Code and Low-Code change in real-time. Your team does not wait for the next release.

Customization that stays upgrade-safe

In cplace, every No-Code and Low-Code adaptation stays within the platform standard. Upgrades remain straightforward, and your customizations do not become technical debt.

One platform. Four ways to build

No-Code

Configure dashboards, data models, workflows, and role-specific views using a visual drag-and-drop environment. No programming knowledge is required. Changes go live immediately, with no deployment needed.
For: Business analysts, PMO staff, and anyone comfortable working in Excel or PowerPoint.

No-Code mit cplace

Low-Code

Add business logic, automations, and custom reporting with lightweight scripting. Basic JavaScript knowledge is enough. Low-Code scripts activate in real time, within the permissions IT defines. No release cycle, no waiting in the queue.
For: Power users and process owners who want to solve problems themselves, without being full-time developers.

Low-Code mit cplace

Pro-Code

Full SDK access for professional developers who need to build highly customized solutions, complex integrations, or advanced UI components from scratch.
For: Software engineers who wish to extend cplace to its full technical depth.

Pro-Code with cplace

AI Builder

Build a complete PPM application from unstructured business input: Excel files, PDFs, or just a conversation. Extend your existing cplace environment: AI Builder builds on what you have, so every addition fits seamlessly into what you’ve already built.
For: Teams who need a PPM solution adapted to their processes.

Explore cplace AI Builder
cplace AI Builder

AI that works where your team works

A platform that grows with your business

cplace Citizen AI extends the No-Code and Low-Code environment with generative AI that any business user can configure and deploy. Your PMO team builds their own AI assistants, embeds smart chat interfaces directly into their workflows, and automates complex tasks without filing a single ticket. Citizen AI puts the tools in the hands of the people who actually understand the work.

See AI use cases
cplace No-Code and Low-Code with embedded AI puts the tools in the hands of the people who actually understand the work.

You describe it, cplace builds it

With the AI Widget Studio, a simple natural-language description becomes a finished widget in cplace. It integrates seamlessly into your No-Code and Low-Code environment: the widget runs on the same data model and the same permissions as any other customization. This lets you build custom dashboards, charts, or boards in minutes instead of weeks, with over 40% lower implementation costs.

Explore AI capabilities
cplace AI Widget Studio

Freedom to build. Control by design

cplace gives business teams the freedom to build and adapt within boundaries that IT defines. Every customization stays within the platform standard, fully auditable and upgrade-safe. Role-based permissions determine who can build what. That governance extends to AI. What a user cannot access manually, they cannot access through AI either.

  • Full audit trail for every change
  • Role-based access control across all platform levels
  • Every customization stays upgrade-safe by design
  • No shadow IT, no uncontrolled development
More on AI governance
cplace AI governance

The ability for our business users to configure cplace directly—through No-Code and Low-Code—was a real game-changer for how our business and IT teams work together.

Christoph Heinemann
Business Project Lead, Continental Reifen Deutschland GmbH
Continental Reifen Deutschland GmbH Logo

Ready for PPM that thinks ahead?

cplace PPM software

Frequently asked questions

What is No-Code development in an enterprise context?

No-Code development means that business users configure, build, and adapt software applications without writing any code. In cplace, this happens through a visual drag-and-drop environment where users assemble dashboards, define data structures, create workflows, and design role-specific views. Anyone who works comfortably with Excel or PowerPoint has the skills needed to work as a No-Code developer in cplace. Changes take effect immediately during live operation.

What is the difference between No-Code and Low-Code?

No-Code requires no programming knowledge at all. Users configure solutions visually using pre-built components. Low-Code extends that capability with lightweight scripting, typically basic JavaScript, or users who want to add business logic, automate complex processes, or build custom reports. In cplace, both approaches work on the same platform and data foundation, and both apply changes in real time without requiring a deployment cycle.

What are citizen developers, and how does citizen development work in cplace?

Citizen developers are business users outside of IT who build or customize software solutions themselves. In cplace, they work within defined boundaries set by IT, using No-Code and Low-Code tools and embedded AI to create dashboards, automate workflows, and adapt existing solutions to their team’s specific needs. This reduces the load on IT while ensuring that the people closest to the work are the ones shaping the tools they use.

What is cplace Citizen AI and how does it fit into No-Code and Low-Code development?

cplace Citizen AI is a native extension of the No-Code and Low-Code environment. Business users configure AI assistants, automate complex tasks, and embed smart chat interfaces directly into their workflows, without IT involvement and without a separate AI tool. Because Citizen AI runs within the same permission framework as the rest of cplace, governance and access control apply automatically.

What is the cplace AI Builder and how does it speed up application development?

The cplace AI Builder lets your team generate a fully configured, governed cplace application from their own inputs. Upload an Excel file, a PDF, or workshop notes, describe what you need, and AI Builder creates the data model, layouts, and application structure for you. What used to take weeks of manual configuration now takes a fraction of the time.

Does No-Code and Low-Code development in cplace create technical debt?

No. Every adaptation made in cplace stays within the platform standard, which means all customizations remain upgrade-safe. This is a fundamental difference from traditional enterprise software, where heavy customization often makes it difficult or impossible to apply vendor updates cleanly. In cplace, you can customize freely without losing the ability to upgrade.

How does cplace differ from other No-Code and Low-Code platforms?

Most general-purpose No-Code and Low-Code platforms give you a blank canvas. cplace is purpose-built for enterprise project and portfolio management, which means your team starts from proven PPM solution templates rather than from scratch. cplace also applies all changes in real time during live operation, something most other platforms do not support. All three development tiers—No-Code, Low-Code, and Pro-Code—share one data foundation, so teams at every skill level can collaborate without duplicating data or managing separate tools.

Is No-Code and Low-Code development in cplace secure for enterprise use?

Yes. cplace uses a role-based permission system that determines exactly who can build what, and at which level of the platform. Every change is versioned and fully auditable. IT defines the guardrails, and citizen developers work within them. No customization can exceed the permissions assigned to the user making it. This applies equally to standard development and to AI-powered workflows built with cplace Citizen AI.